ATTACHMENT_8_-_FINAL_TECHNICAL_BRIEFING_CONTENT.DOCX
Published: 01/21/2016
Description
ATTACHMENT 8 Final Technical Briefing The Contractor shall provide a final technical briefing at the end of the POP. The briefing shall be conducted at a location to be specified by the Government. This briefing shall include the following informatio...
