ITB#NH 2016(810) PAVEMENT REP AND OVERLAY, TEXAS
Published: 01/23/2016
Description
COUNTY: BRAZORIA HIGHWAY: FM 518, ETC LENGTH: 17.6400 MI CONTROL NUMBER: 0976-02-091, ETC DBE GOAL: 0.0 % PROJECT NUMBER: NH 2016(810), ETC TYPE: PAVEMENT REP AND OVERLAY TIME FOR COMPLETION: 122 WORKING DAYS GUARANTY: 100,000.00 BIDS RECEIVED UNTIL:...
