ITB#STP 2016(852) REPAIR, LEVEL-UP, WIDEN AND OVERLAY, TEXAS
Published: 01/25/2016
Description
COUNTY: CALDWELL HIGHWAY: SH 21 LENGTH: 5.19 MI CONTROL NUMBER: 0471-04-029 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2016(852) TYPE: REPAIR, LEVEL-UP, WIDEN AND OVERLAY TIME FOR COMPLETION: 36 WORKING DAYS GUARANTY: 50,000.00 BIDS RECEIVED UNTIL: 1:00 PM ...
