QUESTIONS_AND_ANSWERS_RESTROOM_541_SET_3.DOC
Published: 01/25/2016
Description
Questions and Answers Restroom 541 Set 3 1) The SOW states 5' past footing and the septic drawing show the 6" main lateral 6' to a component which looks to be a slab or structure other than the building. Is there a site plan that shows the main later...