PWS_-_ATOMIC_SPECTROMETER_MAINT.DOCX
Published: 01/28/2016
Description
Performance Work Statement Period of Performance: 9 Apr 2016 – 8 Apr 2017 The Contractor will provide one preventive maintenance visit including: Check the condition of the electrical supply cable, control cables, and gas lines Check the ground ing...
