QUESTIONS AND ANSWERS
Published: 05/13/2016
Description
REPAIR (R&M) 19 MXS HQ ROOF BLDG 362 NKAK 13-1042 PRE-DESIGN QUESTIONS 13 May 2016 Is fire sprinkling required in the new attic r equired ? Fire sprinklers are required – See UFC 3-600-01, paragraph 4-2.3.6. If so, does the existing building have a...
