MTRS_DRAFT_SECTIONE_INSPECTION_AND_ACCEPTANCE.PDF
Published: 06/10/2016
Description
E INSPECTION AND ACCEPTANCE E.1 TEST AND EVALUATION All testing and events described include the MTRS Inc II system as a whole, including integration kits. The contractor shall be responsible for supporting Test & Evaluation for the MTRS Inc II as ou...
