ATT_(10)_PPL_CDRL_LR04.DOCX
Published: 07/19/2016
Description
PPL TOP DOWN BREAKDOWN (TDBD) REQUIREMENTS The contractor shall build a complete top down breakdown (TDBD) of the end item/system /equipment as follows: All field level repairables (i.e., fourth character of SMR code is F, G, H, L, or O and the fifth...
