PACKAGE.ZIP
Published: 07/19/2016
Description
Att_(10)_PPL_CDRL_LR04.docx PPL TOP DOWN BREAKDOWN (TDBD) REQUIREMENTS The contractor shall build a complete top down breakdown (TDBD) of the end item/system /equipment as follows: a. All field level repairables (i.e., fourth character of SM...
