PROJECT_ADDENDUM_-_BID_OPTION_1_POND_REPAIR.PDF
Published: 07/21/2016
Description
PROJECT ADDENDUM Bid Option 1- Additional Ponds REPAIR CATFISH PONDS – FY2015 USDA, ARS AQUATIC ANIMAL RESEARCH FACILITY AUBURN, ALABAMA Prepared By: ARS WBSC Engineering 5/25/2016 Bid Option 1 The following ponds are to be repaired and priced as B...
