PACKAGE.ZIP
Published: 08/29/2016
Description
SOW.docx STATEMENT OF WORK (SOW) Scope of Work The Contractor shall provide inspection of bulk storage tanks listed in Table 1. All tanks are aboveground storage tanks. Prior to inspecting each tank, the Contractor shall coordinate with the Cont...
