DPW-10016-2J_-_SOW_(REVISION01).PDF
Published: 08/30/2016
Description
DPW-10016-2J Building 2201 Roof Repair Additions to the Scope of Work (30 August 2016) The ground surface at the earth anchor trench and the surrounding area that is disturbed during construction shall be regraded to drain away from the earth anchor ...
