SCOPE_OF_WORK.DOC
Published: 08/30/2016
Description
S16_GBS_0816_10 WORK ITEM 1: Life Boat Cradle Installation 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to modify one life boat cradle to allow the life boat harness to operate without any interference. 1.2 ...
