PACKAGE.ZIP
Published: 08/30/2016
Description
SCOPE_OF_WORK.doc S16_GBS_0816_10 WORK ITEM 1: Life Boat Cradle Installation 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to modify one life boat cradle to allow the life boat harness to operate without an...
