AK SLING-SOW
Published: 08/31/2016
Description
AK Sling Statement of Work C.1 Scope: The Contractor shall provide, inspect, package, and deliver AK Slings. C.2 Requirements. C.2.1 Manufacture of Parts. The Contractor shall provide, inspect, package, and deliver 1770 Viking Tactics Wide (Padded) S...
