AMENDMENT #13
Published: 09/02/2016
Description
QUESTIONS 12 AND 13 12. The Geo Engineer Provided a H pile option and this was basis of the design . They are saying in that report to hammer them to achieve 35 Kips maximum . The problem is section 31 62 00 in section 3.2 , paragraph (A ) prohibits ...