USCGC_WALNUT_(WLB205)_STUFFING_TUBE_RENEWAL_CVU_.DOCX
Published: 11/02/2016
Description
S16-0013_30400_CVV_0816_225WLB WORK ITEM 1: Weather Deck Stuffing Tubes, Remove/Renew/Repack 1. SCOPE 1.1 Intent. This work item describes the requirements for removing, renewing, and repacking various stuffing tubes on the weather decks on USCGC...
