RFB#NHPP0702-352 REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS), CHANGEABLE MESSAGE SIGNS (CMS) AND LANE USE SIGNS (LUS) ON THE EASTBOUND AND WESTBOUND TUNNEL APPROACHES AND INSIDE THE HANGING LAKE TUNNELS, AND TRAFFIC CONTROL, COLORADO
Published: 12/09/2016
Description
Printed On: 12/05/2016 Colorado Department Of Transportation Notice To Contractors Contract ID: C20547 Contract UDBE Goal: 10.40 % Guaranty: 5% of Total Bid For plan pricing, call (303) 757-9313 Fixed Completion Date: 11/1/2018 Res. 3130 PETER LOMBAR...
