IFB#STPAA-0021(557) PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF SR-47 TO THE WILCOX COUNTY LINE. LENGTH 7.581 MI, ALABAMA
Published: 02/06/2017
Description
Alabama Department of Transportation Proposal Item Summary 067. STPAA-0021(557) MONROE COUNTY 55 Working Days 3.00 for constructing the Planing, Resurfacing, and Traffic Stripe on SR-21 from the junction of SR-47 to the Wilcox County Line. Length 7.5...
