P45964_SOW.DOC
Published: 02/06/2017
Description
TCTO_T420-42200_24300_RRY_1216_20 WORK ITEM 1: Science Van Relocation, Piping Modifications 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to install new piping runs associated with the relocation of the two (...