RFI_21_TO_25_WITH_SKETCH.PDF
Published: 03/09/2017
Description
RFI 23-26 Pre-award Project 051940 21. Notes 1 and 2 on drawing E104 state the replacement panels to be installed in place of panels L5D-1 and L5C-1 are to include 200% rated neutrals. Do the existing panels L5D-1 and L5C-1 have 200% rated neu...
