RFB # 413 CONSTRUCT AN ADDITIONAL LANE ON KY 922 (NEWTOWN PIKE) FROM PINTAIL DR (MAIN ENTRANCE TO THE MARRIOTT GRIFFIN GATE) TO THE BEGINNING OF THE SOUTHBOUND IÂ?�75 ENTRANCE RAMP, KENTUCKY
Published: 03/24/2017
Description
2017 LETTING SCHEDULE APRIL�JULY TYPE OF WORK LETTING DATE 28�Apr�17 DIST NO. ITEM NO. COUNTY CALLOWAY PF ROUTE PROJECT DESCRIPTION MINOR SHOULDER WIDENING ON KY 299 FROM KY 121 (MP 3.103) TO THE CALLOWAY/MARSHALL COUNTY LINE (MP 10.665) IN CAL...
