CLIN13DESCRIPTION.DOCX
Published: 04/07/2017
Description
Elk 16 Description/SOW Sub-Items 13.1a, 13.1b, 13.2a, and 13.2b: Work consists of hand thinning and hand piling in the Elk 16 Project Area. The Contractor will be required to identify skips and gaps as described in the DUIS. The work will require ...
