ATTACHMENT_P6_BREAKOUT_PRIME.XLS
Published: 04/10/2017
Description
Instructions Instructions Government: A On Footer Tab for the worksheet, insert the RFP number after the colon. B Contractors should be instructed to total their proposals by cost category (e.g. Labor, Material, Travel). These totals will ...
