PACKAGE.ZIP
Published: 04/11/2017
Description
New_Version_of_Tech_Specs.pdf Concrete Patching Material Technical Specifications Scope of work: Bidder is to remove any delaminated concrete in the spall areas, which is located in the flowline of the Outlet Works tunnel #5 and #6. Af...
