RFI_DATED_11_MAY__2017.DOCX
Published: 05/11/2017
Description
RFI DATED 11 May 2017 Modular Building During the site visit we were shown an in-ground concrete box and were told that that box was where we would be getting the power for the new modules. Item 3.1 says we “shall determine total building load, ...
