DRAFT_J.2_SECTION_C-N_-_PWS_(4-21-17).DOCX
Published: 05/15/2017
Description
SP3300-17-R-5010 Attachment J.2 SECTION C-N - SUPPLEMENT TO ATTACHMENT J-1 SECTION C-SITE SPECIFIC REQUIREMENTS A. In addition to the requirements identified in Attachment J-1, Section C, the Contractor shall perform all of the requirements in Att...
