TRACK_INFRASTRUCTURE_ASSESSMENT_DESCRIPTION_APR_17.DOCX
Published: 05/15/2017
Description
TRACK infrastructure assessment DECRIPTION INTRODUCTION The 846th Test Squadron (846th TS) is seeking a subgrade and concrete girder assessment along the entire 10 mile length of the Track. The purpose of this assessment is to identify and ultimately...
