PWS
Published: 05/16/2017
Description
ADMINISTRATION, PREVENTATIVE MAINTENANCE, AND REPAIR OF INTRUSION DETECTION AND CLOSED CIRCUIT TELEVISION SYSTEMS PERFORMANCE WORK STATEMENT (PWS) SECTION 1. SCOPE OF WORK: The contractor will: (a) The contractor will provide a minimum of two fulltim...
