Q&A_3.DOCX
Published: 05/18/2017
Description
1. Is there only the one dry well at the Water point / FAC-11 site? a. Yes, that is our intent to have one dry well for both chlorine analyzers. 2. For the water point well pit, how much plumbing to remove to install the chlorine analyzer? a. Our...
