ATTACHMENT_-_2_SPECIFICATIONS.DOCX
Published: 06/08/2017
Description
SECTION 01300 SHOP DRAWINGS AND SUBMITTALS PART 1 GENERAL 1.01 SCOPE: A. Perform all work necessary and required for the construction of the project as indicated. Such work includes but is not limited to the following: 1. Shop Drawings 2. ...
