VA248-17-R-0887 ATTACHMENT 02 SPECIFICATION SECTION 01 32 16 17 PROJECT SCHEDULE.PDF
Published: 06/08/2017
Description
04-11 01 32 16.17 - 1 SECTION 01 32 16.17 PROJECT SCHEDULES (SMALL PROJECTS – DESIGN/BUILD) PART 1- GENERAL 1.1 DESCRIPTION: A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the co...