PREPROPOSAL_CONFERENCE_INSTRUCTIONS_SP330017R5011.DOCX
Published: 06/13/2017
Description
SP3300-17-R-5011 Preproposal Conference Instructions (a) A pre-proposal conference for the Contractor-Owned/Contractor Operated (COCO) Material Processing Center (MPC) and transshipment point within the Port of Salalah, Oman requirement will ...
