VA257-17-B-0929 DRAWINGS-MRI PAVILION.PDF
Published: 07/12/2017
Description
COORDINATION A. The Contractor shall compare the Architectural, Structural, Mechanical, Electrical, Plumbing, and other series drawings and report any discrepancies between each set of drawings and within each set of drawings prior to fabricati...
