SECTIONS L AND M OF THE DRAFT RFP, 12/1/00
Description
section_m.doc DRAFT DRAFT CECOM SEC Systems and Software Engineering Support Section M - Evaluation Factors For Award v 2.10, 28nov00 1.1 Basis For Award. Any award to be made will be based on the best overall proposal with appropriate ...
