RFI RESPONSES (DOCX)
Published: 08/08/2017
Description
RFI Responses 1. Lightning protection system modifications (primarily relocating aerials and re-connecting to main roof loops) is to be included in the scope of work; use the attached specs/appendix for requirements. As a part of the work, contracto...
