PIH ATCT SOW (PDF)
Published: 08/08/2017
Description
PIH – POCATELLO ATCT CAB WINDOWS REPLACEMENT DEC 2014 SUMMARY OF WORK PAGE 1 SUMMARY OF WORK 1.0 GENERAL 1.1 SCOPE The selected Contractor shall furnish all labor, product, equipment, materials, and supervision for the demolit...
