SUMMARY OF WORK-DEMO (DOC)
Published: 08/08/2017
Description
Seattle ARTCC July 2013 Administration Wing Restrooms Demolition SECTION 01000 SUMMARY OF WORK PART 1 – GENERAL 1.1 scope of work These specifications, together with the referenced specifications, standards, and drawings specified in the Contra...
