NAVAIDS RWY 19 SPECIFICATIONS (PDF)
Published: 08/09/2017
Description
CONSTRUCTION SPECIFICATIONS AND DRAWINGS Installation of a GS, RVR, 2 PAPI’S, and a MALSF BLDG to serve RWY’S 19L & 19R at the San Francisco International Airport September 15, 2013 Prepared by: FEDERAL AVIATION ADMINISTRATION AIR TRAFFIC ORGA...
