DRAFT SOW (DOCX)
Published: 08/09/2017
Description
PART I - SECTION C DESCRIPTION / SPECIFICATIONS Tower Simulator System Site Preparation at Detroit Metro, Airport Traffic Control Tower (ATCT) in Detroit, MI Scope of Work.- Construction of Tower Simulator System (TSS) room in the basement of th...
