SPECIFICATIONS,_DATED_7_AUGUST_2014
Published: 08/09/2017
Description
7 August 2014 SPECIFICATIONS – NDI LIFTING DEVICES 1. SCOPE The contractor shall replace five (5) processing stations on the current Penetrant Processing System and connect all required air, electrical and water lines to ensure a fully f...
