SOW (DOC)
Published: 08/09/2017
Description
Attachment 1 Statement of Work for High-Rate Load Frame June 10, 2014 Introduction This document defines the required configuration, performance, delivery, setup, testing, and support of a new high-rate load frame. The system will be installed a...
