PERMIT_DOCUMENTS_IFB_HSCGG1-17-B-PRV148_STATION_FIRE_ISLAND_WATER_DISTRIBUTION_SYSTEM_REPLACEMENT.PDF
Published: 08/14/2017
Description
c ~ B - A 1 I 2 GENERAi NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL FIELD LAYOUT. THE CONTRACTOR SHALL MAKE TIES TO ALL UTILITY CONNECTIONS AND PROVIDE MARKED-UP RECORD DRAWINGS FOR ALL PROPOSED UTILITIES SHOWING TI...
