GLEN_15-3303_RFI-07_SANITARY_SEWER_RESPONSE.PDF
Published: 09/13/2017
Description
GLEN 15-3303 FA2550-17-R-1016 RFI #7 1. Section 1.2B &1.3 Will Record Drawings be the responsibility of the contractor to produce and provide to the government? Will a PE stamp be required? Govt Response: AutoCAD drawings will be provided fro...