SOW_FOR_FBO.DOCX
Published: 10/30/2017
Description
STATEMENT OF WORK 1.0 TITLE – Rising Step Load Testing (RSL) Services 2.0 BACKGROUND AND OBJECTIVES – NSWCCD Code 612 is tasked by PMS 397 to provide engineering and material testing support for the Diesel Exhaust Program. RSL testing is required to...
