HEALY_SOW_ADG_TURBO_ACCESS_CUT_R0.DOCX
Published: 11/09/2017
Description
1. Temporary Access Cut 1. SCOPE 1.1 Intent. This SOW describes the requirements for a temporary access cut in the 04 level above the Auxiliary Diesel Generator (ADG) Room (03-65-0-E) for removal of the ADG blower. 1.2 Government-furnished proper...