ITB#STPAA-HSIP-0018(509) CONSTRUCTING THE SAFETY WIDENING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-18 FROM THE LAMAR COUNTY LINE TO WEST OF THE JUNCTION OF SR-107 WEST OF FAYETTE. LENGTH 4.515 MI, ALABAMA
Published: 11/10/2017
Description
Alabama Department of Transportation Proposal Item Summary FAYETTE COUNTY DBE Goal Percent: 4.00 Contract Time: for constructing the Safety Widening, Resurfacing (Scrub Seal), and Traffic Stripe on SR-18 from the Lamar County Line to west of the...
