ITB#NH-0074(541) & NH-0067(507) CONSTRUCTING THE PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-74 (US-278) FROM THE CULLMAN COUNTY LINE TO EAST OF THE INTERSECTION OF SR-79 IN BROOKSVILLE (SITE 1) AND ON SR-67 FROM THE JUNCTION OF SR-53 (US-231) TO SOUTH OF THE CULLMAN COUNTY LINE (SITE 2). LENGTH 8.959 MI, ALABAMA
Published: 11/10/2017
Description
Alabama Department of Transportation Proposal Item Summary BLOUNT COUNTY DBE Goal Percent: 8.00 Contract Time: for constructing the Planing, Resurfacing, and Traffic Stripe on SR-74 (US-278) from the Cullman County Line to east of the intersecti...
