ITB#HSIP-I020(347) CONSTRUCTING THE MEDIAN BARRIER PROTECTION (CABLE GUIDERAIL INSTALLATION) ON I-20 FROM 0.400 MILE EAST OF THE SNOW CREEK BRIDGE TO THE SR-46 INTERCHANGE. LENGTH 18.720 MI, ALABAMA
Published: 11/10/2017
Description
Alabama Department of Transportation Proposal Item Summary CALHOUN AND CLEBURNE COUNTIES Contract Time: for constructing the Median Barrier Protection (Cable Guiderail Installation) on I-20 from 0.400 mile east of the Snow Creek Bridge to the SR-...
