ATTACHMENT_L-5_IDIQ-MAC_COST_SUMMARY_SPREADSHEET.XLS
Published: 11/15/2017
Description
Instructions Instructions Contractor: 1 On Footer Tab for the worksheet, insert the firm's name after colon. 2 This worksheet assumes a period of performance of January 1, 2018 through December 31, 2018. 3 The worksheet shall be format...
